Category Archives: Uncategorized
Mod-Bit Torch Down
Posted by tbo
Posted in Uncategorized
Mod-Bit Torch Down Upgrade by Cool Roofing Network
- 35,000 sq. ft
- Mod-bit torch down
- 53 Temp Reduction (131 before and 78 after)
- $ 21,000.00 T.I.A.P.
- $ 10,500.00 Rebate Incentive
- Modified Bitumen Torch Down 35,000 Sq Ft
- Mod-Bit Torch down after Cool Roofing LARS application
Modified Bitumen Torch Down Cool Roof
Posted by tbo
Posted in Uncategorized
Mod-Bit Torch Down Upgrade by Cool Roofing Network – 2019
- 15,520 sq. ft.
- Mod-bit torch down
- 71 Temp drop (148 before and 77 after)
- $ 7,372.00 T.I.A.P.
- $ 1,290.00 Rebate Incentive
- Mod-Bit torch-down After Cool Roof LARS Application
- Mod-Bit Torch Down Before Cool Roof LARS application