Malabar Associates Ltd.
Malabar Associates Ltd. of Palm Bay
Air conditioned square footage: 26,280
TIAP Tax incentive: $ 15,768.00
Utility rebate incentive: $ 11,826.00
Estimated savings in A/C electricity: 20-25%
Roof Type: Built Up Gravel
Roof temperature before: 163°
Roof temperature after: 84°
Savings in roofing cost: Over a span of 30 years it is estimated to save approximately $200,000.00